The GridReady Series

STANDARDIZED AI INFRASTRUCTURE

A factory-configured physical infrastructure
package for high-density AI and GPU deployments

500 kW modular building block Designed for existing powered buildings and phased expansion

The gap inside a powered building

Allocated power and a usable shell do not automatically support modern GPU racks

THE SITE MAY ALREADY HAVE
•Allocated utility power
•Commercial or industrial building
•Fiber, security and basic distribution

What is missing is the physical layer

MODERN AI COMPUTE NEEDS
•High-density power distribution
•Liquid cooling and room heat removal
•Preconfigured racks, controls and commissioning


The platform supplies the repeatable layer between building infrastructure and GPU servers.

The cabinets arrive as an integrated thermal and power assembly


Each cabinet supports a range of GPU configurations without aisle containment


FRONT TO BACK
•Thin passive front-door heat exchanger
•Replaceable air filter
•48U or 52U server cabinet
•Two high-density intelligent PDUs
•Full-width manifold frame with quick
connects for direct-to-chip liquid cooling
•Active rear-door heat exchanger
•Ready for High density equipment


Air only, direct-to-chip only, or hybrid

Flexible cooling within a common 500 kW envelope

FDHx & RDHx
DIRECT TO CHIP
HYBRID

Flexible cooling within a common 500 kW envelope
Capacity can move between cabinets as server density and cooling method change

 

Density up to 175+ kW PER CABINET
Final supported density depends on server configuration, coolant requirements and the
total module load.

Factory preparation and site work run in parallel

The 30–60 day target applies to qualified sites with adequate power and normal approvals

  • QUALIFY
    • Confirm power, access, layout and site interfaces
  • CONFIGURE
    • Finalize racks, cooling zones and power connections
  • PREPARE
    • Factory assembly and
      testing run with site
      preparation
  • CONNECT
    • Set equipment, connect utilities and commission the system

 

Factory acceptance testing reduces field integration and commissioning uncertainty before equipment ships.